Upper Crust Repair

After a micro-burst caused failure in the roof structure, The Structures Group was called in to provide emergency response. Roof structure was shored for life safety. The Structure Group coordinated all aspects of the repair including engineering, shoring, electrical, mechanical, and ceiling panel subcontractors. Repairs were performed using portable hydraulic presses.

Materials : Open-web wood purlins.
Scope : Truss repair, lead contractor for engineering and other subcontractors.
Structural Design : GJC Engineering